Project Description
Construction of a new water transmission main to replace the old system. Construction includes installation of new water mains complete with service connections and all other apparatus to provide an operable pressurized water system conforming to AWWA Standards, requirements; abandonment and/or removal of existing water mains; installation of hydrants. A total of 13,700 lf of 8” PVC C900 with 314 1” MUNICIPEX Services in three areas in the City of El Monte. This is the first CIP Project of 2 in the same community.
Water Main Replacement Project CIP No. 014